Building Fisherrow Brewery:

Sunday October 10th 1999

Those tanks had to be made clean enough to actually work on. In the case of the future copper, this was interesting! The lines on the wall continue to be filled with paint. The welder popped round to see what needed to be done, and various members of the local branch of CAMRA appeared throughout the day.


(85K)

(86K)

(109K)

(130K)

(122K)

(122K)

(126K)

(102K)

(118K)

(122K)

(95K)

(127K)

(86K)

(126K)

(121K)

(65K)

(106K)

(79K)

(110K)

(107K)

(101K)

(110K)

(108K)

(113K)

Index

This page created on a Macintosh using PhotoPage by John A. Vink to create the thumbnails and the basic table. It was then extensively Messed With in a text editor.