Building Fisherrow Brewery:

Monday October 18th 1999

Most of the pipework was planned today, but that doesn't make a pretty picture. After putting a test patch of gloss paint on the copper, we decided it needed some filling. We also had a visit from some friends with an interesting vehicle.


(75K)

(82K)

(56K)

(62K)

(52K)

(69K)

(128K)

(137K)

(74K)

Index

This page created on a Macintosh using PhotoPage by John A. Vink to create the thumbnails and the basic table. It was then extensively Messed With in a text editor.